SPILLS PREVENTION PROGRAM
Terratechnik Environmental Limited (TTK) is invested in environmental protection throughout all aspects of its operations. Terratechnik pledges responsibility to act in the most environmentally sustainable manner with respect to spills prevention. Terratechnik takes every precaution and implements numerous spills prevention initiatives including, but not limited to:
In the event of an accidental release, the site-specific Emergency Response Plan and Spill Prevention Contingency Plan would be immediately implemented. All project sites are more than adequately equipped to handle all possible accidental release events as outlined in the Spill Prevention Contingency Plan including, but not limited to:
As outlined in Terratechnik's Environmental Protection Policy any environmental impairment resulting from an accidental release will be efficiently and expertly remediated as directed by the appropriate regulatory bodies.
For more information on our assurances please contact Barry Harris; President of Terratechnik Environmental Limited.
CONTINUE TO:
Assurances
NEWS SERVICES & CONFERENCES
NEW GENERAL CONTRACTING DIVISION
Terratechnik has opened a new general contracting division covering residential, commercial and institutional construction projects.
*NEW PROJECT AWARDS
Terratechnik has just been awarded a contract for the Construction of the East Northumberland Secondary School Track.
LAND AQUISITION
Terratechnik acquires 4 acres of land in Mississauga, ON. Outdoor storage available.
TERRATECHNIK CONTINUES TO PUSH FORWARD
We have purchased a Geoprobe® 420M ultra-portable direct push drill rig. Click here to read more.
We have just purchased a Kenworth T800 Float, 61,000kgs Registered Weight. Float Services Available
Call us: (905) 855-4943
See a summary of our Service Capabilties
Globe 2012
Vancouver, British Columbia
14-16 MARCH 2012
Conference Website
WaterTech 2012
Banff, Alberta
11-13 April 2012
Conference Website
WEAO Symposium
Ottawa, Ontario
22-24 APRIL 2012
Conference Website